The Illinois Department of Transportation announces that a lane closure will be installed on US 30 in Whiteside County, Illinois.
The lane closure will be on the Gateway Bridge each day over the Mississippi River in the EB lane beginning Monday, October 5, 2020 through Wednesday, October 7, 2020.
A second lane closure will then be installed in the WB lane on Thursday, October 8, 2020 and Friday, October 9, 2020. Lane closures for each day will be from 8:30 AM to 3:30 PM.
Consultants will be performing a bridge inspection.
Please slow down and use extreme caution while driving through all work zones.
For IDOT District 2 updates, follow us on Twitter at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.